1.
Multiple Choice
In LAYOUT FINALISATION, which of the following is not the Secondary Details :-
Future expansion of switchyard should be easily possible
In seismic prone zones height of structures should be as low as possible.
Location and Orientation of Main Entry of Switchyard
The outgoing transmission line should not cross each other
2.
Multiple Choice
For Field Test , Significant depth of Exploration For isolated fdn :
0.5 to 1 times the width
1.5 to 2 times the width
2.5 to 4 times the width
None
3.
Multiple Choice
For Field Test , Significant depth of Exploration For Pile fdn :
1m to 5m
5m to 15m
20m to 35m
4.
Multiple Choice
In reamed piles type of Deep Foundations :-
are constructed to a depth of 1 to 3m into the ground
are constructed to a depth of 3 to 8m into the ground
are constructed to a depth of 10 to 18m into the ground
None
5.
Multiple Choice
In Friction piles type of Deep Foundations :-
Terminated at Lower depth
Terminated at Higher depth
Terminated at Average depth
None
6.
Multiple Choice
What is the MINIMUM REQUIREMENT of Contour survey extending outside the boundary wall on all sides :
up to at least 2 m
up to at least 5 m
up to at least 10 m
None
Explore this activity with a free account
Find a similar activity
Create activity tailored to your needs using
Pharmacy
•
University
Earthing & Lightning Protection
•
Professional Development
Punjabi Cuisine
•
KG
Day and Night
•
KG
Human Resources Management
•
Professional Development
Baroda Connect
•
Professional Development
Housekeeping
•
University
First Impression
•
University