Professional Development

Professional Development

Image

Basic Civil Engineering

2.3K
plays

17 questions

Show Answers
See Preview
  • 1. Multiple Choice
    1 minute
    1 pt

    In LAYOUT FINALISATION, which of the following is not the Secondary Details :-

    Future expansion of switchyard should be easily possible

    In seismic prone zones height of structures should be as low as possible.

    Location and Orientation of Main Entry of Switchyard

    The outgoing transmission line should not cross each other

  • 2. Multiple Choice
    1 minute
    1 pt

    For Field Test , Significant depth of Exploration For isolated fdn :

    0.5 to 1 times the width

    1.5 to 2 times the width

    2.5 to 4 times the width

    None

  • 3. Multiple Choice
    1 minute
    1 pt

    For Field Test , Significant depth of Exploration For Pile fdn :

    1m to 5m

    5m to 15m

    20m to 35m

  • Answer choices
    Tags
    Answer choices
    Tags

    Explore all questions with a free account

    Already have an account?