No student devices needed. Know more
14 questions
Product layout is generally used for standardized goods.
True
False
Which of the following refers to the term ‘autonomation’?
Poka-yoke
Jidoka
Andon
5S
If it takes 20 minutes of net production time to make 10 pieces, what will be the cycle time?
20
0.5
2
Cannot be calculated from this information
An activity that is wasteful and doesn’t add value or is unproductive is called:
Muda
Mura
Murari
Muri
What is an Andon Board?
Visual control device on production line
Visual control device for inventory control
Visual control using charts such as control charts
Visual control for production plans
SMED stands for Single-Minute Exchange of Dies.
True
False
What is the target setup time in SMED (Single Minute Exchange of Die)?
No more than of one setup every shift
Maximum of one setup every day
less than ten minutes
less than one minute
Which of the following is Muda?
Sign boards
Stressful environment
Demand fluctuations
Defects
Which of the following terms in the seven types of wastes categorized by Ohno considers the movement of product between manufacturing processes as no value-addition task, expensive and can cause damage to the product?
Overproduction
Waiting
Transportation
Excessive inventory
Which of the following is a visual and/or audible communication system that calls for support or attention in a process whenever needed?
Poka-yoke
Benchmarking
Andon
Muda
Which of the following refers to ‘Level Scheduling’?
Andon
Muda
Heijunka
Muri
Which of the following is not related with JIT implementation?
Pull System
Push System
Zero inventory
Zero lead time
MRP is a ____ system and JIT is a _____ system.
pull, pull
push, push
push, pull
pull, push
Which of the following means ‘visual cards’?
Poka-yoke
5S
Muda
Kanban
Explore all questions with a free account