No student devices needed. Know more
70 questions
Scaffolding
Adamyo / Plantsa
eskumbro
kusturada
staka
Foreman
piyon
kantero
kapatas
maestro de okra
eskuwala
Triangle
Square
Try Square
Trapezoid
CEMENT BRICK
baldosa
ladrilyo
lastilyas
pastilyas
Pickwork on masonry
pineka
kanteria
piteka
piketa
WAINSCOTING TILES
asolehas
asolehos
soleras
kusturada
Bolt
turnilyo
roskas
tuerka
pierno
PUNSOL
Rivet
thread
Drawbore pin
Chisel
pitsa
WASHER
NAILER
NUT
THREAD
MASON
piyon
kapatas
latero
kantero
Senepa
FASCIA BOARD
EAVES
EXTERIOR WALL
GUTTER
Mesa Pahingaan
Handrail
Riser
Landing
Turnaround
The act, process or manner of constructing the structural frame of a floor.
bridging
Floor framing
solid bridging
Floor finishing
MEDIA AGUA
gable roof
hip roof
canopy roof
rainbow roof
Bottom Chord
tirante
tahilan
reostra
kilo
Collar plate
kuwelyo
caballete
reostra
sinturon
RIDGE ROLL
caballete
pie de gallo
tirante
tahilan
Gutter
Kanal
Alulod
tubo de banada
sibe
Baseboard
radopis
bolada
rodapis
krokis
VERTICAL STUD
Pabalagbag
tabe anzo
tabike
pilarete
balangkas
Framework
Projection
Skeleton
Shell
Horizontal Stud
pilarete
kostilyahe
pabalagbag
kisame
tapal
MITRE
FILLER
PUTTY
MITER
WINDOW HEAD
pasamano
hamba
sombrero
pasomano
PANELED DOOR
de bendeha
de kadena
monyeka
kanal
trankilya
TRANQUILITY
TRANSOM
BARREL BOLT
CHAIN BOLT
Schedule/ Pattern
trankilya
monyeka
bandeha
plantilya
CABINET HINGE
espeho
alaho
monyeka
espolon
vaciada
Paneled door
Rabbeted door jamb
Door Fillet
Door jamb
Closed stringer
madre de eskalera
hardinera
barandilla
hardinero
NEWEL POST
tukod
gabay
baytang
balustre
takip silipan
Riser
tread
rest
landing
Sink
dutsha
baniera
prigadero
baniero
lingueta
PIGLEAD
OAKUM
Bath tub
PLAIN G.I. STRAP
poleya
slipknot
slip nut
split bolt
split knob
Cast Iron
hinang
pundido
poleyo
lingueta
Temper (Metal work)
subuhan
hinang
estanyo
suhan
liyabe
plumb line
Adobe Anchor
Bent bar
Axe
Bent bar
baldosa
piketa
bangka
sinotra
Masonry
kantero
kanteria
paupo
kostura
Plastered Course
kusturada
asintada
eskuwaldo
kalinya
SPACING/GAP
baldosa
biyenta
biyento
ladrilyo
CONCRETE SLAB
larga masa
lastilyas
baldosa
buhos
STUCCO
Pintura
cabilla
palitada
piketa
rebokada
SCRATCH COAT
RENDERING COAT
STUCCO
PICKWORK IN MASONRY
WASHER
rimatse
roskas
turnilyo
pitsa
EAVE
alulod
senepa
reostra
sibe
Gable roof
media agua
kuatro aguas
kwatro aguas
dos aguas
alulod
rafter
gutter
conductor
catch basin
TRELLIS
Arbor
pagoda
pulgada
pergola
At any given point on the Sun's path, its height in the sky is called______?
azimuth
azimooth
altittude
altitude
Sun at its highest noon altitude
Autumn Solstice
Summer Solstice
Winter Solstice
Spring Equinox
Sun rises due east, sets due west
21 December - June 21
21 June - December 21
21 September-21 March
21 March - 21 September
Providing enough light and good views
Visual Comfort
Air Quality
Acoustic Comfort
Visual Quality
What is not a form of Heat Transfer
Conduction
Radiation
Reaction
Convection
Transfer of heat between solids through direct contact.
Conduction
Convection
Connection
Radiation
Electromagnetic waves that travel through space.
Radiation
Retardation
Convection
Conduction
Which is not an example of building heat gains?
Conduction Gains
Internal Gains
External Gains
Solar Gains
Refer to additional heat flows generated within the building by the sun.
Solar Gains
Convection Gains
Sun Gains
Internal Gains
In to and out of a building can be source of significant heat loss and heat gain is called __________ .
Uncontrolled Air Leakage
Airtightness
An exchange of air
None of the above
Means that the cold draughts cannot get in, and warm air cannot escape and vise versa.
An exchange of air
Uncontrolled air leakage
Airtightness
Controlled Air tightness
Sources of indoor air quality concern except
Contamination from Inside Building
Inadequate Ventilation
Microbial Contamination
Inadequate Lighting
Design practice in Architecture Centered in creating buildings that function in lockstep with the local climate, not in spite of it.
CLIMATE RESPONSIVE
BUILDING PHYSICS
DYNAMIC ARCHITECTURE
PASSIVE DESIGN
For an adequate amount of air, one rule of thumb states that the operable windows should be _______.
not more than 15% of the floor area
25% or more of the floor area
10% or more of the floor area
20% or more of the floor area
a Trombe wall or sunspace with vents through it, can be used as a thermosiphon.
THERMAL CHIMNEY
HEAT CHIMNEY
SOLAR CHIMNEY
COOLING CHIMNEY
Are thermal storage walls typically consists of a 20-40cm or 8"-16" thick masonry wall painted in a dark ,heat-absorbing color and faced with single or double layer of glass.
Thermal Walls
Solar Walls
Felix Walls
Trombe walls
The following are Passive Cooling Methods except for
SOLAR AND WIND PROTECTION
SOLAR AND HEAT PROTECTION
HEAT MODULATION
JEAT DISSIPATION TECHNIQUE
Aperture facing towards the ______ provides most even illumination (not the brightest).
towards East
towards West
towards the sun's path
towards the Equator
Which is not used as Light redirection strategies
Light Louver
Light Shelves
Buffles
Diffusing Glass Fins
Maximizing the amount of sound absorbing material
Room Acoustical Design
Sound Reverberation
Sound Wave
Sound Reflection
Explore all questions with a free account