1.
Multiple Choice
Total wall length is multiplied by which of the following numbers in order to
estimate the linear footage of material needed for the project?
2
5
3
1
2.
Multiple Choice
How many studs should be added per window and door when estimating
materials?
3
4
5
2
3.
Multiple Choice
Which of the following are support members installed under the door or window
header?
Trimmer Studs
Headers
Tees
Beams
4.
Multiple Choice
Which of the following should be installed after all of the walls are completed?
Trimmer Stud
Tees
Headers
Double Top Plate
5.
Multiple Choice
Which of the following creates the structure for the ceiling of the house?
Ceiling Joists
Ceiling Openings
Trimmer Joists
Headers
Explore all questions with a free account
Find a similar activity
Create activity tailored to your needs using
Floor framing 5th ed

•
10th - 12th Grade
PERFORMANCE STANDARD 5.2 : IDENTIFY AND INSTALL WALL AND CEILING SYSTEMS

•
10th - 12th Grade
Ceiling Joist and Roof Framing

•
11th Grade
Materials Worksheet 1

•
9th - 12th Grade
Ag. Mechanics 1 Unit 4.04-4.05

•
9th - 12th Grade
Carpentry 1 Module 5 Exam Review

•
9th - 12th Grade
Ag Mech I- 4.04: Framing walls, floor and roofs

•
9th - 12th Grade
Ag. Mech Obj. 4.04

•
9th - 12th Grade