20 questions
Meaning of: PCC
Project Construction Cost
Professional Commission Cost
Meaning of: APCC
Awarded Project Construction Cost
Architect Project Construction Cost
Meaning of: FPCC
Final Project Construction Cost
First Project Construction Cost
Meaning of: MDPE
Multiple of Direct Personnel Expense
Minimum of Direct Personnel Expense
Meaning of: PFPE
Project Final Plus Expenses
Professional Fee Plus Expenses
Meaning of: DADS
Detailed Architectural Design Services
Documented Architectural Design Services
Meaning of: DAEDS
Detailed Architectural & Engineering Design Services
Design Architectural & Engineering Detail Services
What SPP Document is the new Methods of Compensation and Schedule of Fees?
210
209
208-B
310
What is the Method of Compensation best used for an initial proposal wherein no set specifications are made—only the project type and the area?
PFPE
Unit Cost Method
PPCC
Retainer
What is the best Method of Compensation applicable for work that requires the Architect’s personal time, such as seminars, oculars, trainings, and the like?
Unit Cost Method
PPCC
Lump Sum
Per Diem
What is the best Method of Compensation for when the project has cost and time constraints that are difficult to determine on the onset of the project?
PPCC
Lump Sum
Salary Cost x Multiplier
Retainer
Which of the following shall not be preferably billed via a Per Diem compensation?
OSH Seminar Attendance
One-Time Client Consultation
Repeated use of an already built project
Site inspection for a probable building location
To whom are the mobilization and operational costs billable to?
Architect
Client
Contractor
Government
Is travel time part of the time spent for rendering the service?
Yes
No
Depends on the distance
Depends on the client
Which of the following is not considered as non-creative work
Site Inspections
Research Work
Rendering Expert Opinion
Regular Design Services
What Method of Compensation is most commonly used?
PFPE
MDPE
PPCC
Lump Sum
What document is required to be produced, signed and sealed, and duly processed by an Architect before the rendering of any services to a Client?
Official Receipt
Logbook of Records
Service Agreement
Contract Documents
When was the new Methods of Compensation of Fees deemed effective by law?
February 18, 2014
May 21, 2014
August 13, 2014
October 15, 2014
What is the law that shall govern for all disputes between the Architect and the Client?
RA 9285
RA 8981
RA 9266
RA 545
Who pays for the processing of the permits and all corresponding fees that entail in securing one?
Architect
Client
Contractor
Government