26 questions
Information regarding delays to a contract must be passed on to the main contractor by means of
Spoken message
Text message
Telephone
Written letter
Test instruments safe use and operating instructions are best found in
BS 88
Manufacturers manuals
BS 7671
GS 38
How many socket outlets are to be installed in the kitchen?
5
3
4
14
How can the level of understanding of a work colleague or new employee be checked?
Ask questions
Written test
Ask colleagues
Practical test
In which room would the supply intake be found?
Bedroom
Lounge
Lounge
Hall
The commissioning process will involve
Installing accessories
Demonstrating how things work
Checking the work against the regulations
Installing cables
Commenting on the speed and quality of work produced by a colleague is considered to be
Co-operation
Motivation
Instruction
Monitoring
A risk assessment has two indexes, those comparing possibility against
Sustainability
Similarity
Severity
Suitability
Who is responsible for producing the drawing and specification for a large installation?
The designer
The sub-contractor
The clerk of works
The site supervisor
Functional testing may involve
Testing earth fault loop impedance
Testing earth electrode
Testing insulation resistance
Operating light switches
It is advisable to check materials arriving on site against
Layout diagrams
Building Regulations
Timesheets
Delivery note
A customer requests the use of a 1980s time clock for which there are no instructions. Where will the instructions for both installation and operation most likely be found?
Electrical wholesaler
Building Regulations
Internet search
Local library
Information for a component’s installation and operation is best sourced from
BS 7671
Manufacturer’s instructions
On-Site Guide
Delivery notes
A Designers specification will identify the type of
Wiring system
Supply cable
Metering equipment
Supply transformer
What type of diagram is shown for the lighting circuit?
Layout diagram
Circuit diagram
Wiring diagram
Schematic diagram
Upon completion of work, copies of the Electrical Installation Certificate are to be
Sent to the local authority
Sent to the NICEIC
Retained by the contractor
Sent to the Building Regulations
A Designer’s specification will identify the type of
Earthing that is required
Metering that is required
Equipment to be installed
Appliances to be installed
It is considered good customer relations and good for business when employees
Discuss working conditions with customers
Develop good relationships with customers
Advise customers without consulting managers
Speak for the employer with no authority
Information to be found on a layout diagram will include
The control sequence
Component positions
How to wire the installation
Methods of fixing accessories
When a company employs 5 or more employees the company must produce
A copy of the Building Regulations
A copy of BS 7671
A copy of the NICEIC handbook
A health and safety policy
What type of safety sign is triangular shaped with a yellow background and has a black border?
Mandatory sign
Warning sign
Prohibition sign
Information sign
If a client asks for information on how a heating system operates and the trainee is unsure. The correct action is to
Seek advice from the employer or a more experienced colleague
Explain that trainees may not know the best answer
Advise the client to go see the site manager
Explain to the customer as well as possible
Trainees who are unsure how a machine operates when asked by a site manager should
Seek advice from the employer or a more experienced colleague
Explain to the manager as well as possible
Tell the manager how they believe it might work
Explain that they are only trainees and would not know the answer
Wherever possible safe isolation procedures should be carried out to
Minimise inconvenience to the user
Finish on time
Make the job last as long as possible
Maximise inconvenience to the user
Communication with customers is important. Agreement must be made with regards to duration of
Wholesaler’s delivery times
Isolation
Inactivity
Work activities
Test leads used with test instruments shall comply with
BS 7671
BS EN 60898
GS 38
BS 88