No student devices needed. Know more
10 questions
In the PTW System, a person assigned to handover the PTW documents after reviews and approval to the Work Leader for commencing the work is...
Responsible Person
Authorizer
Issuer
Supervisor
An activity that could potentially generate sparks or heat should be covered with the PTW...
Cold Work only
Hot Work Category 1
Hot Work Category 2
Cold Work and Hot Work
The following documents should be attached along with the PTW for fixing a leaking hydraulic oil tubing, except...
Isolation certificate
Hot Work certificate
Safety Data Sheet
Job Safety Analysis
A confined space activity with an access from top of a hazardous chemical tank required the following documents, except:
PTW and JSA
Confined space certificate and MCU
SDS and Isolation certificate
Lifting plan for evacuation
Who should verify the isolation points have been properly isolated, locked and tagged prior to commence the work?
Authorizer
Responsible person
Work leader
Panel Operator
Medical examination by a doctor or paramedic is required to be undergone prior to carry out the following activities, except:
Working at height
Confined Space
Hot work
Cold work inside a tank
The following persons could be assigned to apply isolation on a motor breaker, except:
Electrical technician
SREP
Electrical supervisor
Panel operator
The following document will not be found in the PTW bundle for a big pump motor replacement work:
Lifting plan
Isolation certificate
Job Safety Analysis
SDS of chemical in the suction pump
The following person's signature must be obtained in the isolation certificate, except:
Authorizer
Operator or technician who execute the isolation
Both answers are WRONG
Both answers are CORRECT
Whenever General Alarm activated, all active PTW must be suspended and can resume whenever the alarm sound stop.
TRUE
FALSE
Explore all questions with a free account