Which one of the following models is not suitable for accommodating any change?
Code & Fix Model
Prototyping Model
RAD Model
Waterfall Model
2. Multiple Choice
20 seconds
1 pt
In which step of SDLC project termination could be done?
Design Phase
System Maintenance Phase
Feasibility Study Phase
Coding Phase
3. Multiple Choice
20 seconds
1 pt
The fundamental objective of system analysis is to:
Understand computer hardware
Study and understand a complex system and modify it in some way
Design Class Diagram
Testing the code
4. Multiple Choice
20 seconds
1 pt
Which one of the following is not stage of SDLC?
System analysis
Problem finding
System verification and validation
Feasibility study
5. Multiple Choice
30 seconds
1 pt
An iterative process of system development in which requirements are converted to a working system that is continually revised through risk analysis is called:
Waterfall Modeling
Iterative Modelling
Spiral Modelling
None of them
6. Multiple Choice
10 seconds
1 pt
Which of the following name is not a named phase in SDLC?
Assessment
Maintenance
Development
Testing
7. Multiple Choice
30 seconds
1 pt
Which of the following is a true statement regarding the SDLC phase?
The SDLC is not iterative
The life cycle is always a sequentially ordered set of phases
It is possible to completed some activities in one phase in parallel with those of another phase
The software development life cycle is depending on the user expectation
8. Multiple Choice
10 seconds
1 pt
Which of the following is the most important phase of SDLC?
Requirement Analysis
Design
Coding
Testing
9. Multiple Choice
30 seconds
1 pt
Which step of SDLC performs cost benefit analysis?
Feasibility Study
Requirement Analysis
Design
None of those
10. Multiple Choice
20 seconds
1 pt
The iterative model allowed developers to move smoothly in between design, development and implementation - and back again.
True
False
11. Multiple Choice
10 seconds
1 pt
Who is the person who typically manages the software development project?
Software Engineer
Project Manager
IT Programmer
Business Analyst
12. Multiple Choice
20 seconds
1 pt
What are the component should be in the SRS Document, except:
Use Case Diagram
Constraint of the system
Functional Requirement
Blueprint of the system
13. Multiple Choice
30 seconds
1 pt
If the product or solution is first divided into features which need to be developed. If there are new features identified in the midst of complete product release it again gets planned across sprints. What kind of SDLC that suitable for that condition?
Iterative Model
Scrum Model
RAD
Agile - XP
14. Multiple Choice
30 seconds
1 pt
The final step of the system analysis phase in the SDLC is to ...
gather data
write system analysis report
propose changes
analyze data
15. Multiple Choice
30 seconds
1 pt
A feasibility study is used to determine the proposed systems
resource requirements
costs and benefits
availability of hardware and software
all of those
16. Multiple Choice
10 seconds
1 pt
In incremental model, requirements do not need to be prioritize.
True
False
17. Multiple Choice
30 seconds
1 pt
Which of the following are not type of SDLC models?
Code and fix model
Capability Maturity model
Agile model
Big bang model
18. Multiple Choice
45 seconds
1 pt
An example of a functional requirement is _________
Access to the customer order system
System should be available in English and Spanish
System can be accessed through a Blackberry device
System is automatically updated every 5 seconds
19. Multiple Choice
30 seconds
1 pt
In the Analysis phase, the development of the ____________ occurs, which is a clear statement of the goals and objectives of the project.
documentation
flowchart
program specification
design
20. Multiple Choice
30 seconds
1 pt
Which of the following is not a factor in the failure of the systems developments projects?
size of the company
inadequate user involvement
failure of systems integration
continuation of a project that should have been cancelled